Designed, engineered and constructed to the highest specifications
Client:
Dragon LNG
Location:
Milford Haven, Wales, UK
Scope:
Studies, Engineering, Procurement, Construction (EPCm)
Project Details
- 5 MTPA grassroots regasification terminal
- EPCm carried out through KBR’s Leatherhead office.
- Dragon’s liquefied natural gas terminal consists of a jetty, storage tanks and regasification facilities combined with gas export capabilities for 365 days per year of continuous operation.
- The terminal has a maximum gas send out rate to the NTS of 7.6 billion cubic meters of gas per annum (bcma).
Project Highlights
- Designed, engineered and constructed to the highest specification to assure safety, environmental compliance, reliability and quality