Dragon LNG Terminal

Designed, engineered and constructed to the highest specifications


客户:
Dragon LNG

位置:
Milford Haven, Wales, UK

Scope:

Studies, Engineering, Procurement, Construction (EPCm)

Project Details

  • 5 MTPA grassroots regasification terminal
  • EPCm carried out through KBR’s Leatherhead office.
  • Dragon’s liquefied natural gas terminal consists of a jetty, storage tanks and regasification facilities combined with gas export capabilities for 365 days per year of continuous operation.
  • The terminal has a maximum gas send out rate to the NTS of 7.6 billion cubic meters of gas per annum (bcma).

Project Highlights

  • Designed, engineered and constructed to the highest specification to assure safety, environmental compliance, reliability and quality