Skip to main content

Experience

Atlantis Floating Production Unit

88,000 MT displacement production semi-submersible hull


客户:
BP

位置:
Gulf of Mexico

Scope:

FEED, Engineering (Detailed Design), Technical Services, Construction Management

年:

2005

Project Details

  • BP’s Atlantis field was developed using an 88,000 MT displacement production semi-submersible hull receiving product from a number of subsea wells.
  • Water depth: 7,200 ft
  • Production capacity: 150,000 bopd and 150 mmscfd gas
  • Topside weight: 25,500 tons
  • BP, through KBR, studied steel and polyester mooring options extensively before deciding on a steel chain-wire system.
  • KBR subsidiary GVA was contracted to provide FEED and basic design for the hull, deck, quarters, mooring system, and drilling system.
  • Additionally, GVA provided technical support to the construction, procurement, and installation phases and construction management services for the hull.
  • The hull is a GVA 27000 Design, a pure production and quarters semi-submersible (PQ). KBR supported GVA with power, hydrodynamics, and air systems design.

Project Highlights

  • Will remain on location in a 100-year hurricane event
Back to top