SEGAS LNG Facility

Record Firsts in Design, Size, and Schedule


Client:
SEGAS Egypt (Led by Union Fenosa Gas)

Location:
Damietta Port, Egypt

Scope:

FEED and EPC

Year:

2004

Project Details

  • The world's first 5 MTPA Liquefaction train
  • Designed to process pipeline quality natural gas
  • Basis for future KBR large-scale reference design

Project Highlights

  • First Air Products Split MRTM liquefaction design
  • First Grassroots LNG facility in operation in Egypt
  • When SEGAS LNG became operational, it was the largest single train LNG plant in the world
  • Multi-office engineering execution in London, Madrid, Monterrey, and Egypt with procurement out of London
  • 1.2 million engineering manhours; 38 million construction manhours
  • 20% of work performed by local companies
  • On-schedule - under 35.5 months EPC schedule