A challenging project in a remote location
Client:
Woodside Energy
Location:
North of Broome, WA, Australia
Scope:
Basis of Design Study, Two Onshore FEED Contracts
Project Details
• Lump sum contract, study included
• Liquefaction facility (production capacity: 12 MTPA (3 X 4 MTPA LNG trains)), associated infrastructure, and accommodation and marine facilities
• FEED execution in London and Perth
Project Highlights
- Remote site; large and complex marine facilities due to an exposed coastline and tides in excess of 8 meters
- Modular design