One of the most complex processing facilities ever installed
Client:
Conoco Indonesia
Location:
South Natuna Sea - Offshore Indonesia
Scope:
FEED, EPIC
Year:
2004Project Details
- 255,000 DWT vessel
- 26,500 DWT topsides
- 1 million barrels dual product storage
Project Highlights
- The first offshore liquefied petroleum gas (LPG) facility on a floating vessel in the Asia Pacific region
- Designed for a 30-year life without the need for dry-docking
- Hull built in China and topsides built and integrated to the hull in Indonesia