Skip to main content

Experience

Thunder Horse

The largest moored semi-submersible production platform in the world and the largest steel semi-submersible ever built


форум:
BP Exploration

IP-адрес:
Gulf of Mexico

Отметить все строки таблицы:

FEED; Engineering; Procurement; Construction Management; Design of Hull/Marine Systems/Utility Systems; Site and Installation Support; Flowline Jumper-Installation Analysis

Шаблон:

2005

Комментарий и все ответы на него были удалены.

  • The Thunder Horse field is in the Gulf of Mexico in 6,050 ft of water.
  • Thunder Horse is a GVA 40000 Design, combined production, drilling, and quarters semi-submersible
  • KBR contracted to provide FEED and basic design for the hull, deck, quarters, mooring system, and drilling system, technical support to the construction, procurement, and installation phases and construction management services for the hull.
  • Production capacity: 250,000 bopd and 200 mmscfd gas
  • Displacement: 155,000 tons
  • Topsides weight: 21,000 tons
  • Topside dimensions: 112 x 136 m
Back to top