Skip to main content

Experience

NLNGSevenPlus (NLNG Trains 7 & 8)

A joint venture with Technip, Snamprogetti, and JGC (TSKJ Nigeria Ltd.)


Клиент:
Nigeria LNG (NLNG)

Место:
Bonny Island, Nigeria

Scope:

FEED

Год:

2007

Project Details

This FEED is for the further expansion at the Nigeria LNG complex with the addition of two 3.5 MTPA LNG trains (NLNG Trains 7 and 8) as well as additional utilities, product storage and loading facilities. KBR previously constructed:

  • NLNG Trains 1 & 2 – 2 x 3.33 MTPA
  • NLNG Train 3 – 3.33 MTPA
  • NLNG Trains 4 & 5 – 2 x 4 MTPA
  • NLNG Train 6 – 1 x 4 MTPA
Back to top