Skip to main content

Experience

Browse LNG Development

A challenging project in a remote location


форум:
Woodside Energy

IP-адрес:
North of Broome, WA, Australia

Отметить все строки таблицы:

Basis of Design Study, Two Onshore FEED Contracts

Комментарий и все ответы на него были удалены.

• Lump sum contract, study included

• Liquefaction facility (production capacity: 12 MTPA (3 X 4 MTPA LNG trains)), associated infrastructure, and accommodation and marine facilities

• FEED execution in London and Perth

Настройки cron

  • Remote site; large and complex marine facilities due to an exposed coastline and tides in excess of 8 meters
  • Modular design
Back to top