Skip to main content

Experience

ACG (Phases 1–3)

One million barrels per day on schedule


Клиент:
Azerbaijan International Operating Co. (AIOC)

Место:
Capsian Sea - Azerbaijan Sector

Scope:

FEED, Engineering, Procurement

Год:

2008

Project Details

  • The ACG development consists of six new fixed offshore platforms (weighing approximately 220,000 tons in total); two large oil trunklines to shore; pipelines, subsea cables and umbilicals; and an onshore terminal believed to be the largest in the world.
  • KBR designed the offshore facilities (jackets and topsides) and the onshore terminal, and provided procurement support for the entire development.
  • Weights: 7,095 – 16,670 tons
  • Water depths: 118 m – 175 m

Project Highlights

  • Exceeded local content requirements
  • Modular design
  • Successful multi-center execution
  • Highly challenging and remote location
  • Logistically challenging project
Back to top