KBR transformed this remote undeveloped site to an LGN facility with 40% local content and includes storage, offsites, utilities and marine facilities. It is the largest capital project in Indonesia.
This Barrow Island plant is the first fully modularized LNG train and world's largest CO2 sequestration project.
KBR will be the lead on this project that will be offshore and operated by 10 companies.
This offshore floating vessel will be led by KBR and will feature a variety of new technology and processes.
With sustainability outcomes achieved, this train was the 6th built by KBR on Bonny Island.
Completed in 2004, this expansion served as the first Australian LNG and first air cooled LNG plant.
The Project Azure Floating vessel included all-electric drives with GT power generation and an evaluation of steel and concrete hulls.
Egypt's first grassroots LNG set a record of firsts in design, size and schedule. It also features the largest production capacity in a single train in the world.
FEED and EPC services located in a challenging location and environment.
KBR was chosen for EPC of the first LNG plant in Yemen. The plant features APCI technology and is in the construction and commissioning stage.